Vintage Kitchen Remodel - Final Installation and Trades

Vintage Kitchen Remodel - Final Installation and Trades

Christopher Hewett
C
Written by Christopher Hewett

Updated: 05/10/2024


The finish line is close as we arrive at the last phase of execution for our Vintage Kitchen Remodel. The Kitchen Remodel - Part 4 finished up installing the kitchen cabinets, restoring the original trim, and the original maple floors are ready for stain. It's time to wrap up all the major details, from farmhouse sink  installation, to a “pressed tin” ceiling look that we will accomplish in a very unique way. You definitely don’t want to miss this portion of the remodel! Come take a look!


Vintage Kitchen Remodel: Part 5




  • Farmhouse Sink Installation
  • Custom Black Walnut Countertop Installation
  • Subway Tile Backsplash Installation
  • Ceiling “Pressed Tin” Look – Anaglypta Wallpaper Installation
  • Final Electrical, Task Lighting, and Fixtures
  • Final Plumbing and Fixtures
  • Range Hood Installation
  • Cleaning/Prep for Floor Refinishing
  • Hardwood Floor Refinishing – Stain/Finish/Dry
  • Install major appliances and function test





ed74344f073161108b0cd625a29ba9c0b14c2765


Vintage Kitchen Remodel – Kitchen Cabinets



Need more kitchen remodel ideas, or want to see the full list of items used , be sure to check out the MOHF Kitchen Remodel Resource Page for all the details.




Vintage Kitchen Remodel –  Farmhouse Sink Installation




  • Since the Shaws Original 30″ Farmhouse Sink just sits on top of its custom cabinet, this install is pretty straight forward.

  • Make sure all mounting and draining provisions are accounted for and in the right locations.

  • The drain is located toward the left side, so we did shim up the right side, ever so slightly (1/16″), to promote proper draining.

  • As part of your kitchen and cabinet design, install a front sink trim, for a custom, built-in look. NOTE: Again, this template will need to be fabricated by a cabinetmaker with the farmhouse sink and cabinet on site to capture the correct contours/profile. Farmhouse sinks are hand-made and vary slightly in dimensions.

  • Note: the reinforced base cabinet for the heavy, Shaws Original Fireclay Sink (pic #1 in the slideshow)



85e3f6dbfe8201e0f800f41dcb12cbeb6c6f222b    6452467f5008ebdba695119e163656e4fd8960ae

Shaws Original Farmhouse Sink                  Reinforced Farmhouse sink base cabinet




f0d06acba266286bfe8a5a19981fe154da1a1325                       c1c05c16355c64ea8336206b901e855aa6b0140b

Farmhouse Kitchen Remodel – Sink Installed           Front trim cover installed around sink




95e26711d94a3705b918af4abd627182b139b620              0854315979c9a025ea3ed9e4a947ddef91d3b2bd

Tile board up and ready for tile                            Farmhouse Kitchen Remodel – Farmhouse sink   





Custom Black Walnut Kitchen Countertop Installation




  • Our countertops are custom and were made locally by our cabinetmaker.
  • A similar version of the Black Walnut Countertop is available at Lowes 
  • Note: Remember that kitchen countertops are a LONG-LEAD item, and final measurements cannot be taken until the cabinets are installed. After kitchen cabinet installation, make sure to have the countertop contractor on site to measure.  This way you don’t have to go without countertops for too long.
  • Kitchen countertops install BEFORE the subway tile backsplash.
  • Material is black walnut, distressed – dents, burn marks, nail marks, etc. It looks very close to the samples you will find at Lowes.
  • Kitchen Countertop Finish: This is important, as moisture and water sources can ruin your new wood countertop. It is VERY IMPORTANT that you protect the wood and seal it properly.  We did THREE crucial things to make this countertop last for years to come.


  1. Seal ALL SIX sides with Waterlox wood sealer (front, back, top, bottom, left end, right end). We applied FOUR coats on the backside, and SIX coats on the top side (5 in the Waterlox sealer-glossy finish, and the last coat with the Waterlox satin finish). Also make sure to apply multiple coats after any new cuts/holes are made for final fit and sink faucet fixtures.




970109b10b7255a7bf06c2e26dfe2524ba7ba949

               Waterlox


2. Install a vapor barrier on the back side of the exposed kitchen countertop just above the dishwasher. Dishwashers expel a lot of heat, humidity, and condensation. A simple solution to prevent potential  moisture problems is a simple vapor barrier. Most dishwashers come with a small one inch wide piece that sticks at the front edge, but I elected to line the entire back side of the kitchen countertop. I used a thin piece of aluminum from the local hardware store (glued/screwed).





d311b5dbc5668b1869c276bd82e09e5d123a8dbb



3. This step may be a bit overkill, but works great to protect kitchen countertops. Install felt pads to the bottom of any countertop appliances, cutting boards, etc. It protects the same as when applied to chairs, etc for wood floors.





6882a3758288458a5a2c002aea1bf468b68242be




  • Why Waterlox???  Two Reasons  1) Unlike most stains and varnishes, Waterlox is suitable for food prep areas. 2) Easy to refinish – With stains and polys, when the finish gets scratched or needs to be refinished, you have to strip, sand, and reapply. Not with Waterlox! Just scuff the surface lightly and reapply a coat like you would with tung oil, or similar.

 




a18fd04f28e3632b8e78d9e80b6bb57b13fb8b70





4f3f92c7d83153d96d28235ea29d0d39e6f23498

Bare Walnut/Walnut w/ Waterlox





d8d30b1d667f31a72047b88eed9ca11df705c6fc

Vintage Kitchen Remodel – Sink and Cabinets



Hardwood Floor Refinishing – Stain and Finish



So now that the bulk of the kitchen is complete, we can return back to floor refinishing. Referring back to Part 4, we left off with the floors sanded and covered with Ram Board for protection.

  • Remove Ram Board protection

  • Prep TIP: Tape up around the perimeter of the kitchen – around baseboards and painted cabinets. We don’t want to get stain and urethane on the cabinets of the finished trim.

  • Sand the floor one more time with a pole sander (100 grit).  Make sure there aren’t any flaws left in the wood! Once the stain hits the wood, it's too late to fix any imperfections. Lightly wet the floor to look for existing scratches/sanding marks just to be sure. Refer back to Pete’s Hardwood Refinishing Tips, as well.

  • Apply the wiping stain: 1 to 2 coats based on look you want to achieve. We applied one coat here. Dry time 24 hours. We used Old Masters - Early American.

  • TIP:  After this point, walk on floors in stocking feet only!

  • Apply the first coat of urethane (we used a water-based Ceremathane by Graham), dry for 24 hours minimum.

  • Scuff lightly to knock off dust nibs, HEPA vac, wipe with dry micro-fiber mop to remove dust.

  • Apply additional coats (at least 4) and repeat.

  • We applied 6 coats for this kitchen remodel to ensure the best wood protection in the kitchen.

  • Allow floor to dry properly: The last thing we want is foot prints or damage to the floor because we didn’t let it dry properly.

    • TIP:  Allow floor to dry 4-7 days minimum (based on temperature, humidity, etc)…AND…

    • Apply  “red rosin” paper to the floor so you don’t leave footprints/smudges in the new finish.


UPDATE:  After assessing the performance of the water-based urethane, I would no longer recommend these type products for floors. Please refer back to our Hardwood Floor Refinishing guide for details - in short, to save your floors long-term, you want to use a finish that DOESN'T require constant sanding. 

WaterloxSutherland Welles, and Rubio Monocoat are great alternatives that "soak in", therefore they don't crack, peel, and lift like plastic coatings. Even better, when they need a fresh "maintenance coat"...just clean and wipe on another coat!



47fb9fb471ab38aef92ff7dfabf7256057c091e3

Vintage Kitchen Remodel – Wood Countertops



b8ad0324beceecd75163687735b93297c7c1185d



Vintage Kitchen Remodel – Wood Kitchen Countertops, Black Walnut




90ba483de2ccafb56bef8c704eaf9f0b1d7128fb

Vintage Kitchen Remodel – Wood Kitchen Countertops




c2e317a6ed320f36193fd1f9c14fecb312d33947

Vintage Kitchen Remodel – Wood Kitchen Countertops




ab6288691ebbaac0f44884f374e9db3d90c98217

Wood Kitchen Countertops – Black Walnut




2ce2d23f7df3017a205b671ca300b2bc9044823c

Vintage Kitchen Remodel – Wood Countertops




a5aeea540b857040d8b75dce18cc4ff3170a7d9d

Vintage Kitchen Remodel – Faucet/fixtures installed





63562eb03705ed4aa3c48da94435e2d1acc10417

Felt Protection Pads




Subway Tile Backsplash Installation



  • Now that the countertops are in, the subway tile backsplash can be installed.

  • 3″ x 6″ white subway tile from Dal Tile / Home Depot.

  • Grout (sanded): Tec Power Grout (in 908 Dove Gray). 1/8″ gaps. We selected “sanded”, as the non-sanded is smooth, and looks more like a caulked finish.

  • Expectations with the wood countertop: Wood expands and contracts, especially new wood. So…some cracking/loosening of the grout is to be expected where the tile meets the countertop. The Tec “power” grout has an additional polymer/epoxy that keeps it from crumbling, unlike the standard grout. It will still crack a bit, for at least the first few expansion/contraction cycles. So wait a while before repairing. You have two options:

    1. You can reapply a top coat of Tec Power Grout.

    2. Buy a tube of 908 Dove Gray matching caulk, and caulk over the grout later on.

 



4832268a2745007830e937f5b6a1e9dcc55b9e9b

  • My personal preference is to touch up the grout as I hate caulk, and the maintenance associated with it.
  • Once the subway tile backsplash is grouted, make sure to seal it with at least TWO applications of grout sealer. This will help retain it’s color, resist stains and discoloration. Follow up every 2-3 years to keep the grout looking fresh.





efdb446c61af24ffd91fceed68ea0b70732938dd         095ed5489e5dc8d1cadb6998604b53322caf7d42

Tile board up and ready for tile                                     Tile and spacers installed





9ff365f21197f772e2597f89756a7e1489a38929         ed4d17717c09d034f00fab242f8e8c9e670a9867





b18c0ba6a4bfcc9d508dd978f3cd8fd2d7897e62 fedcde4b00556e4dc508ee4fb67b9e7d5edcd49f

Grout applied




“Pressed Tin” Look – Anaglypta Wallpaper Ceiling Installation




  • Our plaster ceilings were in decent shape (no major loose sections), but had many cracks.
  • We wanted to “kick it up a notch” as most often the ceiling is neglected during renovations, especially kitchens!
  • We wanted a “Pressed Tin” look to finish the Farmhouse kitchen remodel. The true “Tin” ceilings were out of our budget, and a little too “In your face” for our 1890 Folk Victorian.
  • The Solution: Anaglypta Vinyl Wallpaper
  • It was a few hundred dollars for the paper and installation. We ended up with a pretty classy ceiling for a little less than $500!

 

    



213cd88dceeee99927c78e8a3bf5d1019a02a963





ec0cfd3612761bb26acde3dfe3b2674903d6495a

Kitchen Remodel – Pressed Tin-look Ceiling




021d5d7d031afd1eee7a54468fddc8a3db28bbd2

 Kitchen Remodel – Pressed Tin-look Ceiling






8b222df79f81db595dc627b9496d07f0ddc37312




    

66203a779bd65893bfe8a219fa9ce1967afb0606





24a9f88134bcc01e4dc6001dc6cf856b27cd7978      bd4f99465a47922337abd6f677ba8f738e962c27

                                                                             




    ba73e8b4c12ecb91d49e3f1cd73b3c6bbc220a3b  

Kitchen Remodel – Pressed Tin-look Ceiling





     2d6338cefec12347b9d7a1aa6fb6da946d14bc02        





8d83fa01a447b4fc441bad25ec737e34f7ff57af

Kitchen Remodel – Pressed Tin-look Ceiling




c35b8a990987a97dd40cd0d194d2e650c9b383f3

Kitchen Remodel – Pressed Tin-look Ceiling






5d3ccbd9804e3fb78f983c468393e72a923d487c

Kitchen Remodel – Pressed Tin-look Ceiling




Ceiling Wallpaper Painted



d44edb8baa6f8db6db3360ec1a763257bcaef280





5fa139cfc3de42cca5f85418df122911916cc7db




Final Electrical, Task Lighting, and Fixtures



Per the kitchen remodel planning and layout, it’s time to finish off all the final electrical boxes, receptacles, light switches, fixtures, and wall plates.

  • Install countertop appliance power strips – (2, 20A, GFCI breaker at the main panel ). To accomplish a “clean” backsplash look, I modified four separate power strips to run the entire length of the cabinet sections. To hide them, they mount up under the cabinet, behind the LED task lighting, and are hidden by the kitchen cabinet front apron – CHECK OUT THE BLOG and VIDEO TUTORIAL HERE
  • Install the electrical boxes and receptacles under the sink: (From the left) – Dishwasher (20A GFCI), Garbage Disposal (20A ,GFCI), Cabinet Lighting (20A), Spare (20A).
  • Install the electrical box and receptacle in the cabinet over the refrigerator:   Microwave alternate (20A, GFCI).
  • Install refrigerator receptacle: 20A
  • Install range hood and cabinet lighting electrical boxes and receptacles: (from the left) –  Spare (20A), Cabinet Lighting (20A), Range Hood (20A), Spare (20A).
  • Install wall light switches and wall plate, 2 each – ceiling lights and cabinet lights.
  • Install LED task and cabinet lighting: Four circuits, with their power supplies, plug into 110v outlets laid out across the room (as described above). This applies to the task lighting (above counter), upper cabinets, and lower cabinets, for total lighting needs.
  • Install pendant light over the farmhouse sink.
  • Install a schoolhouse light in the center of the room.
  • Ensure all circuits, connections, and receptacles are properly installed to code.
  • Turn on all breakers at the main panel and check for proper function.




74211b1778b7d36e8531f2eef0693ae7162c06cf

Range hood wiring





90347d091bab87c557285a61c20910bd1ee5e36e

Range Hood receptacle





9e6c03cc80b8bd95bdbc90771ae015a60d02687d

Circuits: Spare/Lights/Hood/Lights






b8dac8341346544235cd47905cfb9ebefe6f7aff

Customized plug strips (hidden)






0f141290e920657f2dbef6ae60adfde58d622ead






60f8f616710d7fd57bd519ac7f32e1450d823a2d

Electrical receptacles





f84d90931c685fdfce4b12e1d733c1f0284628e3

LED Task lighting (under cabinet)






5fa166b3abce3ad84fe39bc7d5b79588a1373237

LED Diffusers


68178b3bb9ea1de54251c3f3a7d325e3b746ee03


LED Kit





3e6f2906e05f2a2894c2ca68103e3eccac8dd287

Kitchen Remodel – Schoolhouse light





7729f510aafc85abbfa90098354b81618a423904

Kitchen Remodel – Pendant light






d69973ca9902fc8d5bb768c38e0e8834cefdaac8


Kitchen Remodel – Push button switches

 



Vintage Kitchen Remodel – Final Plumbing and Fixtures



This phase of the Kitchen Remodel, we completed the installation of the water supply lines/shut-offs. Then the sink flange and garbage disposal quick-connect flange, sink faucet/sprayer.  And finally, the soap dispenser, garbage disposal, sink plumbing, and pot filler.

  • Water supply lines/shut-offs: New PEX lines up from the basement, with new shut-offs.

  • Install the sink flange (seal with plumbers putty) and install the garbage disposal quick-connect flange – SNUG ONLY, AS OVER-TIGHTENING CAN CRACK THE SINK!

  • Install the Perrin & Rowe faucet, sprayer, and soap dispenser. Then connect the water supply lines (from the shut-offs to the faucet).

  • Install the garbage disposal: Twist and lock the garbage disposal unit into place on the quick-connect flange. Attach the lines from the dishwasher. Install the power switch (button) on the countertop, attach the airline, and plug in both – garbage disposal and power switch.

  • Install final sink drain plumbing: Install PVC drain, P-trap, vent, and make the connection to the garbage disposal (black pipe).

  • Install the pot filler: Insert the proper length brass fitting from the wall mount, then screw on/mount the pot filler. TIP: The brass fitting needs to be long enough to extend just inside the final finish of the subway tile. The pot filler must screw in far enough, so the plate will cover the transition – from pot filler to wall. 

  • Check all plumbing and fixtures for correct operation and check for leaks.




16f9b752280c42990c753e434cd46d7e1362d174                                           ca5cb4f5a1792ebc2f7d6fa2bd1fcf82f246fbca

                                   

New water supply lines                                     Farmhouse Kitchen Remodel – 4 holes drilled for   

                                                                               faucet fixtures




5b7c8562f7f567e48576003c5ac0d121d48aeb6b                                   bee22a9f3302584a711e6d96aadef311c1370999

Twist/lock disposal into place                                              Disposal air switch




c82701878d4d65e0d1f12230cca9103056710b3e                               d5877538a56d4470cd338362615290525e589732

New sink drain plumbing                                    Blue PEX Feed From the Left – Notice I

                                                                                got lucky. Pot Filler Mount lined up on

                                                                                wall stud!




fd9739ad7b38f404218a951a3eda5b344f2f6407                        cd4ada2884122ce94128bacaef9770d44b7b9bd2

Access hole through cabinet                         Faucet plumbing attached




32a15e64d9f3fbd9f7d3cf22ab682624069e80a7                       54ef6afd0cdd058f14610cb696ef60357b548bf7

Farmhouse Kitchen Remodel                    Farmhouse Kitchen Remodel – 

Faucet/fixtures installed                             Farmhouse sink




0be852c324f8695fbbc801d0d677e45d1c975275                 5c5a2f16c03c9bd3aed7958047e0899314de25ac

Install flange w/plumber’s putty              Air switch power control box




51197e696fbf236b879284fb61f81b6cd89c11f3                                       b91eb0137032e37ac322d9accd365543befdb034

Ensure correct depth from finished surface (tile)          Slide trim ring into place




Z-Line Range Hood Installation




  • Install the Z-Line Range Hood: The hood housing slides right up into the custom cabinet and mounts with the supplied brackets.
  • Make the connection at the back of the hood housing, to the duct (at the wall). Seal the connection.
  • Plug in 110v power supply (in the cabinet) and remote blower control (that runs to the basement).
  • Ensure all final connections and ducts are complete in the basement for the remote blower.
  • Turn on and perform a function check.

 



54f038ee32251ac76e61cbf42e97978574bc8634

Diagram: Range Hood with Remote Blower





bd30488da994fcf0fedd384283aef054b563a4f2

Duct Attaches to Remote Blower in Basement





0bf511f85816578c6fb1566e90aeaead92f3e809

Duct Exits to Outside Just Above the Foundation





56bb80a25e508cc8e54fa5fa261024f8ab01cf0c

Hood housing in kitchen





e8038c7d974c37b3748e84b50d44f85a4178f202

Farmhouse Kitchen Remodel – Cabinet ready for range hood






6f323e67273b5a6b68af5f580e981d762dcf6abc

Circuits: Spare/Lights/Hood/Lights




ae8da3923818945051343f6c0a06d83bc72e8563

Z-Line Range Hood









c877fefbeed032a04228d65bda7a4979f8f7224f





62c81c99fd08786af00d099af0f8a09ad406b0c7                                       397c5309996db4de5684b954d7897b7234c67840

Tighten/position to level set                                             Farmhouse Kitchen Remodel – Cabinets







Cleaning/Prep for Floor Refinishing




  • Clean the entire kitchen to prepare for floor refinishing.
  • The kitchen must be clean and free from all dust, dirt, and debris, so the final floor finish isn’t contaminated.



cc260dada6f4d1f46158386e63390de10d59db80

Kitchen Remodel – Hardwood Floor Refinishing




Hardwood Floor Refinishing – Stain and Finish



So now that the bulk of the kitchen is complete, we can return back to floor refinishing. Referring back to Phase II, we left off with the floors sanded and covered with Ram Board for protection.

  • Remove Ram Board protection
  • Prep TIP: Tape up around the perimeter of the kitchen – around baseboards and painted cabinets. We don’t want to get stain and urethane on the cabinets of the finished trim.
  • Sand the floor one more time with a pole sander (100 grit).  Make sure there aren’t any flaws left in the wood! Once the stain hits the wood, it's too late to fix any imperfections. Lightly wet the floor to look for existing scratches/sanding marks just to be sure. Refer back to Pete’s Hardwood Refinishing Tips, as well.
  • Apply the wiping stain: 1 to 2 coats based on look to achieve. We applied 1 coat here. Dry time 24 hours. We used Old Masters in Early American.
  • TIP:  After this point, walk on floors in stocking feet only!
  • Apply the first coat of urethane (we used a water-based Ceremathane by Graham), dry for 24 hours minimum.
  • Scuff lightly to knock off dust nibs, HEPA vac, wipe with dry micro-fiber mop to remove dust.
  • Apply additional coats (at least 4) and repeat.
  • We applied 6 coats for this kitchen remodel to ensure the best wood protection in the kitchen.
  • Allow floor to dry properly: The last thing we want is foot prints or damage to the floor because we didn’t let it dry properly.
    • TIP:  Allow the floor to dry 4-7 days minimum (based on temperature, humidity, etc)…AND…
    • Apply  “red rosin” paper to the floor so you don’t leave footprints/smudges in the new finish.




a4b3f75c2a0e952cc58987404bc40d98c453eeda

Satin gives a “matte” furniture look




23d72da077340d2064bbe1cdc8b8428b10b77987

Kitchen Remodel – Hardwood Floor Refinishing





5b72b9e798cd84ef836a8c04e4c8f356a5abce1b

Raw floor, sanded and ready for stain





d45c34f72326ddb0414a31cc4537426fa02c241a

Wiping stain application




78f6ac2931509cdc5b44007aec3bc2ee1c1a32bf

Color is “Early American”






0ccf72b8940af40820fbe2a2d8c5725d53a7e3c5

Kitchen Remodel – Hardwood Floor Refinishing




04ecc1ca49f582805ffebf852c9483db672c453c

 Kitchen Remodel – Hardwood Floor Refinishing



90d3cdbbd8c53e6d9abfd0d7961f62ca34d79323

First application of the urethane topcoat





17b831272090ae3035c9c7796ff06c5c704259fe





136ef29b5b56e6627d4b6845b62bd4d7e1e7a7c1





20005d44d1c99df473233e07dc94db99787d62c1





For more information, go check out our Hardwood Floor Refinishing Technical Blog!




Farmhouse Kitchen Remodel – Install Major Appliances and Function Test



Now it's a moving day! Time to finally move in all the appliances, install them, and perform a function check.

  • TIP: Prior to moving any heavy items across the newly refinished floor:
    1. Re-install the old Ram Board on top of the “red rosin” paper to protect the floor.
    2. Apply felt furniture pads to ALL major appliances (refrigerator and Range/stove feet), so future servicing and cleaning won’t damage the floor while moving appliances around.
  • KitchenAid Refrigerator:
    1. Carefully roll into the opening, make the ice maker water line connection, plug it in , check for leaks, THEN gently roll into place.
    2. General Rule –  1″ space/gap all the way around for proper ventilation, and 2″ in the rear, against the wall.
  • Fisher & Paykel Dishdrawer:
    1. Gently slide into opening, while feeding in all the drain lines and power cord.
    2. TIP: Make sure there are no kinks in the drain lines.
    3. Make all the drain line connections per the installation instructions, and plug in the main power under the sink.
    4. Ensure the unit is level and plumb. Mount/screw the frame to the adjacent cabinets.
    5. Install hardware to front custom cabinet door covers, then install per instructions – top and bottom drawer doors.
    6. Power on, inspect for leaks, and proper function.
  • Verona Classic Range:
    1. Assemble electrical plug and gas line plumbing, per instructions.
    2. Gently slide into the opening.
    3. Make gas connections and check for leaks.
    4. Plug in at the power source.
    5. Slide into the wall and ensure the range is level and plumb.
    6. Power on and perform function checks.
    7. TIP: Check oven temperature accuracy (with thermometer) while new/under warranty as they can vary wildly or be calibrated incorrectly from the factory.



bce5ac7fb93d01bad9ba5d4fe01ae670feabd909

Attach dishwasher water line




2c36657f347e517ec45a45a5d12ab3a8cec44fb6

Slide in opening, set level






2438dcb44dd446098c38b332e006e291bf72458c

Fasten to sides of cabinets



5e203310d8213f5c1be30c3d76a6ff95a0c72bda

Feed drains through, connect to disposal 







0b136b5c03901dbf24a98b328f74fab4e81ec999

Hook up gas line and plug in





c9401d4300241db23277ccc3bab1e52cbe18e291

Function check all appliances






c7bbfc3f90580ab56291cbd178d688b251838a92

Kitchen Remodel – Red Stove





038ed7d2f3df13625c2d93aeab47290db35ef36b

Slide to rear wall




36e228e3428217dca787c97c1ecba67fe3301fb8

Attach water line, check for leaks



APPLIANCE INSTALL IS COMPLETE! 


Need more kitchen remodel ideas, or want to see the full list of items used , visit the MOHF Kitchen Remodel Resource Page for all the details.

 




Stay tuned for the last two steps of the Kitchen Remodel Planning Process:

Part 6:  Project Monitoring and Controlling

Step 7:  Program Closeout

 

 



Best of luck, and keep on Fixing!   

Christopher Hewett My Old House Fix









For more info visit:  directory.myoldhousefix.com

Logo gray white new




Posts may contain affiliate links. If you use these links to buy something, we may earn a small commission (at no additional cost to you). Full disclaimer HERE.

    


 

Previous Post Next Post