Part 7 of the Vintage Kitchen Remodel brings us to the final phase of the project, so don’t miss out - Kitchen Remodel Lessons Learned & Closeout. This phase wraps up all remaining details, work, inspections, and lessons learned, which we will document and take on to the next project. Let’s wrap up this kitchen remodel project!


Vintage Kitchen Remodel Lessons Learned and Closeout


  • Kitchen Remodel “Punch List”


  • Final Work To Be Completed

  • Final Function Checks

  • Final City Inspection

  • Final Cleanup

  • Final Payments/Invoices

  • Product and Material Returns

  • Kitchen Remodel Lessons Learned



f3a8cd9224e772589fd022cc45591950a1b2ee99



Kitchen Remodel “Punch List”



The last phase of work left us with everything installed in our new kitchen. So now we just need to go back and clean up all the final details and finish the remaining work.

  • The “punch list”  – Whether it’s your personal “to do ” list to complete the kitchen 100%, or your contractor’s list, make sure it’s complete so nothing is forgotten.

  • This list is especially important with contractors, to ensure all remaining  work is completed to satisfaction before any final payments are made.



5bd97e4b34c646ba521c845b75238072fd07e2dc




Final Work To Be Completed




Install Cabinet Hardware

  • There are many, many options and configurations to choose from!
  • TIP: Leave the hardware for last, and bring home different samples to see how it will look in “real time” – sizes, shapes, diameter, finish.
  • Location – There are so many options, and almost no standards when it comes to location and mixing/matching (same style knobs, pulls, bars).
  • For example, the style of pulls we used come in multiple sizes, from 4-12 inches in length. The knobs have a large and small diameter option too. So, you really need to see them in person, to get the look just right!
  • This is why you want to do “trial runs” to see what looks best with your cabinet configuration. Spacing really comes down to personal preference and aesthetics. Again, this almost drove us crazy, but again, there are really no absolute standards.
  • TIP: Look at kitchen remodel magazines and books for ideas to get you started.



c1878a3e3f2c7416dcca2242d039ae175688e778           22f739a897dc4a6c2aec968ec89e64986ca36938         dfdf982b91f5267718e1d1623b26e0a6aa791732




eec074b05f34ed2cb66089fa47d1e8e1972fe2dd            56b407770a3ab62c853e77ca4bf738a198e503c1        a31006e19ea12d0ec37ab5947ef0a30bf1659b95




b70a426af26aca33c28b6701fe5a75f51a8eeff3           836b2561c736c1d63e66cfa098c9530c230043cc          205aa359935c257999955ac8e9e417d4913d7770




11cc8e4a5bf6e039f170e901ab62da16551cec5e         3e4984eed67a80183b1a46807d5ce908b0771283            54b5707947ab91b7e83f1969217c41540d720d67



Install Custom Cabinet Toe Kicks

  • Two-piece configuration – 1) Backplate  2) Front trim piece

 



9d3537c02f40af14fe789576c417fc0756274a45            995187d61769c288deaa1891bf8c6ec06d8d3f35   





  Caulking, Painting, Touch-Up

  • There will definitely be small tasks left over now that all the major work is done.
  • Caulking around the sink (inside/outside), and around the cabinets.
  •  Painting any areas scuffed/damaged during the final kitchen assembly.
  • Fill nail heads (trim, toe kicks, etc), and paint touch up.




 

Final Function Checks


  • This is the final opportunity to perform ALL mechanical/electrical function checks before the final inspection.
  • Check all appliances, plumbing, and electrical for proper function and for leaks (if applicable).
  • Function – Make sure refrigerator is operating at the correct temperature, making ice, etc. Ensure the stove is heating properly and at the correct temperature.
  • TIP: We used a standard BBQ digital thermometer (with probe) and found our large oven was off by 40 degrees, thus needed a service call to re-calibrate and replace the thermostat. Better to know this while it is still under warranty! Verify everything!!!
  • Leaks – Make sure there are no water OR gas leaks (plumbing, appliances, etc)




Final City Inspection


  • Refer back to Vintage Kitchen Remodel: Part 4 – ProjectManagement for detailed inspection information.
  • Remember to schedule a back-up day in case you fail inspection and have minor rework to perform.




 

Final Cleanup


  • Time to haul off all remaining scraps and demo items! Need a simple solution? Check out the Bagster. I have used them a few times, and they are awesome! Buy the bag, fill it up, and then schedule a pickup. The truck pulls up at the curb, extends a boom arm into your yard, picks it up, and DONE!





  • HEPA vaccuum all surfaces.
  • Wipe everything down
  • Wipe down interiors of cabinets to ensure they are dust-free and clean before leading your dishes, etc.
  • Remove your Zip-Wall if still installed.


20171001_130657





Zip Wall Zipper

ac4ff091dd896f5eb4a13dd64a68a72325cfffa5



Final Payments and Invoices


  • This step is pretty self-explanatory, but the focus is to reduce your risk.
  • Never pay contractors 100% of the project price until it is completed to your satisfaction, and/or per the contract and scope of work!



  • Save



Product and Material Returns


  • Now that the project is complete, round up any/all unused or excess materials and supplies
  • TIP: Hold onto some excess like tile, or anything that might be broken/damaged in the future, that may be hard to replace. You’ll thank me down the road!
  • Return any unused materials and excess before the return policies run out. Stay on top of this one, as you don’t want to be stuck  with an expensive pile of excess at the end of the job!





Kitchen Remodel Lessons Learned




 

  • Protect Your Wood Countertops
    1.  Revisit Farmhouse Kitchen Remodel: Part 5
    2. Seal all 6 sides, to include after holes are drilled, and final cuts made.
    3.  Vapor barrier above the dishwasher.
    4.  Glass cover for espresso machine – If you have a hot, messy appliance that likes to spew steam, water, and coffee grounds…protect your wood countertops. We had this custom piece of glass made.
    5.  Add felt furniture pads to potentially damaging items like mixers, chopping blocks, small appliances, etc


 

  • Try To Anticipate Interferences– We encountered a few!
    1.  The Refrigerator – With french doors, any location against a wall, etc, will be challenging. The left door will only open about 70%. We’ll have to live with it!
    2.  Kitchen Cabinet Hardware – Pay close attention to potential clearance issues here.  Our plan was to go with the vintage “pulls”, but those plans were thwarted due to tight corner cabinet clearances. We had to go with knobs instead, but it turned out ok. We didn’t want to THREE different types hardware anyway – knobs, pulls, and bars.


  • Kitchen Cabinet Hardware – Remember not all kitchen cabinet hardware templates that you can buy will line up with every cabinet/hardware configuration (especially when centering). So expect to layout/install some locations manually, or easily modify your hardware template.





  • Cracks in Plaster and grout are inevitable, but easier to fix than you think!
    1. Our plaster guy re-skimmed the walls – Fixed for a few hundred bucks!
    2.  We used the anaglytpa wallpaper o the ceiling – Fixed for a few hundred bucks!
    3.  Expect grout to crack from “new” material movement (tile board and drywall is pretty stable, but other new materials are not…like our countertops. So as previously mentioned, we’ll have to go back and touch-up.


  • Kitchen Load Planning
    1. Remember: A place for everything, and everything in its place!
    2. Use “smart” storage options and organizers.

That is all for Kitchen Remodel Lessons Learned!

 

Conclusion of the Farmhouse Kitchen Remodel Series



So…all good things must come to an end! I know remodeling is tough and can be very intimidating at times. I must admit, along this journey, I thought the same myself, on several occasions! Rest assured that knowledge is power! I sincerely hope this Farmhouse Kitchen Remodel series has served to guide, encourage, empower, and educate you on your journey as you fix, repair, maintain, and restore your Old House!

Again, if you need kitchen remodel help or inspiration, head on over to the My Old House’Fix” Kitchen Remodel Resource Page !


Best of luck, and keep on Fixing!   

Christopher Hewett My Old House Fix









For more info visit:  directory.myoldhousefix.com

Logo gray white new




Posts may contain affiliate links. If you use these links to buy something, we may earn a small commission (at no additional cost to you). Full disclaimer HERE.

 

Previous Post Next Post