Old House kitchen lovers rejoice! As we continue the restoration of The Eiting House (c.1890), located in Ann Arbor’s Old West Side Historic District. We’ll be performing a complete overhaul of the kitchen, bringing it up to modern standards, and adding some modern conveniences along the way - but we'll start with the Kitchen Design!
156c54ae81ab5f2f78d40f532374e900c335c377
Kitchen Design - don’t worry!
We aren’t about to remove any of the historic characters or features that have been 128 years in making…that would be a crime! In fact, we’ll be bringing back some of the original features that have been hiding for decades. In keeping with the rest of The Eiting House restoration, we’ll be staying true to its historical character by preserving and/or restoring all original, defining features.
6bd3cdf06b5bc1dc4fccb3ea05dde90fa69918e7
KITCHEN DESIGN - PREPARE YOURSELF MENTALLY
I’m not going to sugar-coat it, any large project that I have tackled has been difficult…difficult but rewarding! This was my first kitchen remodel, and with all 22,623 moving pieces, I was unsure and overwhelmed at times! I admit it. For this reason, we will have a plan. And we will think long and hard about this plan. We will refine this plan. And once it’s time to execute this plan, it will make the journey oh so much easier. Think of it as a road trip – WITH or WITHOUT a road map. With proper thought and planning YOU CAN do this! I Promise! So, to prepare you, at times, from start to finish, you will feel:
58fe565797a0cb40e5700a25f0e07f1e755c7813
ENERGIZED
INTIMIDATED
DETERMINED
FEAR
FRUSTRATION
DEFEAT
VICTORY
These emotions are normal, but with a solid plan, and utilizing all the resources we have today (Internet, city inspector feedback, neighbors, friends, family, YouTube, and group info like MOHF), you will be just fine!
KITCHEN DESIGN - PLAN FOR KITCHEN REMODEL SUCCESS
a91bced6586076262e92eb219730ce81363ad4af
Do your homework – become an expert on the topics.
Have a good plan and update it often.
Ask questions (rely on your resources)…never stop asking questions!
Have patience and take your time when executing – DETAILS matter!
And finally, Ask more questions! There are no stupid questions! No one has your best interests in mind…except for YOU!!!
04eeac9c4db025a587167ae8fb35fd2fa19fd12c
So…let’s get started, shall we!
KITCHEN DESIGN - EXISTING KITCHEN SETUP / CONDITIONS
It's time to put our previously learned project planning skills to use. So, if needed, refer back to House Project Planning 101 for a refresher, as this will be the basic 5-step project process we will follow for the Vintage Kitchen remodel.
THE KITCHEN – CURRENT STATE PRE-DEMO
532d1386785e8f6d77b02a0984579748fd8dd2bf 98c4ccde7e4e6ab013aa0ab471217aa21eec8640
BEFORE – Refrigerator Wall
2796ea48daed64cc268bfa8dcf7af31110190914 5ebc31be315fb8aefa9220202ce18fbf7086d27b
4a8e3e7ddeb628f0185fc9f1507ecfc44c0a71f4 60251c612ab79a453f9e68a0e8868096b3974d6e
BEFORE – Kitchen, Sink/Stove Wall
80f2b87075c834c5adbe5b9c7912aa81bbcbfbe7 252da58235d570f3559c09589e03597b4bc219a0
KITCHEN DESIGN - REMODEL STEP # 1: PRE-PLANNING
Remembering back to House Project Planning 101, this is where all our initial ideas, brainstorming, coordination, and planning were born. This step sets the direction of the project, so get it right! Don’t skip this important step! The most important question: What is the VISION and MISSION STATEMENT for the new kitchen?
KITCHEN BASELINE INSPECTION
d38a7011134e97ed73396b6765a2f499720f15e1
Here it is!!!
Our current kitchen is quite dated – from the 1970s – 9′ x 13′ with 9′ ceilings, and an angled wall to the right.
L – Shaped layout. Which is one of the most efficient kitchen layouts, so this will mostly stay.
Outdated materials – From flooring to cabinets, countertops, and backsplash.
Minimal storage with no pantry.
Plumbing is fine, but all new electrical equipment is needed. Ceiling and wall plaster are cracked.
PREFERENCES / RESEARCH / INPUT
c716b73fce489c94c02beeca7b201a6f9ff23572
Vision: A vintage-style kitchen that reflects a style more appropriate to the age of the house (c.1890).
What we think we want, versus what is actually possible, versus what we really want. We’ll learn a little about expectation management, for sure!
Goals/Objectives:
To preserve/restore the historical integrity of the house.
Inject period style, that integrates seamlessly with the rest of the house.
Use of materials and components that will give a “timeless” look and feel, thus minimizing the threat of becoming quickly dated if we were to follow current “remodel trends”. Be careful – Trends create planned obsolescence.
Increase kitchen function, flow, user friendliness.
Our Priorities, Needs, and Wants:
Preserve and restore any original kitchen defining features – Trim, baseboards, plaster, etc.
We want a kitchen that is easy to clean, use, and maintain. The struggle – can “pretty” also be “functional“? Not always…but sometimes you choose it anyway.
Wood countertops.
Quality Kitchen Cabinets – Solid wood (no press wood), dovetail joints, plywood boxes, soft-close hinges, etc.
“Built-in” characteristics for the kitchen cabinets and appliances, to integrate and flow seamlessly into the design, for a clean, simple, and uncluttered look.
Tile floor for durability and ease of maintenance (spoiler alert, things change!)
Dual oven (36″) with pot filler and vent hood (vented outside).
Large farmhouse sink for all those large items we currently have problems washing – pots, pans, cook top grates, etc (current sink is shallow, dual basin, with low rising faucet).
Improved lighting – overhead, cabinet, and task lighting.
Dedicated coffee station/area/espresso machine.
Hidden trash, recyclables, and produce bins.
Increased storage that is efficient, and add a small pantry. Minimal storage on countertops is preferred.
Wish Lists (with details) – Kitchen Cabinets, Storage, Stove/Hood, Lighting, Hardware Flooring, Appliances.
dd76c1cf598878eb2b317daddb05d2df67621f34 d9c48e6d023106d7db9080015145a7669205889e
2ea21d184a70d2b29b630ef87451c0493af583560ab5b665b0f92cbf4283df8312cf9b9ea5b9cc03
2424f50e685cf099097b1267f050b8d9b71740a8
KITCHEN DESIGN - REMODEL IDEAS / BRAINSTORMING
This is the time to take all the ideas, brainstorming, and wish lists, to see how everything is coming together. It’s a virtual and actual “mock” shopping trip. Visit as many locations as possible (in person and online) to become extremely familiar with all the components, materials, appliances, fit and finish. Use all resources that are available:
Big Box stores
Specialty kitchen remodel shops
Online Resources
Forums
Houzz
Magazines (clippings)
Home Tours
Neighbors, Friends, Family
Product Reviews and Ratings
fdbb2446709b4dfbff08ec493a22970401f95bb6
9685ad5aad9ddb9551df80c1e851c7c865526f64
c3b104b0c345e596ad9a9a283c69773f41749ebb
61eebb487c21eaeb41f017ab9b31d54dff18a25b
25a84bf0c9e6f981b5b1f4b28a858ba3a683fdc1
f54953ed16cb2f85a405a1bc38beb213b5e839fe
976f83e3d074e163e88c95a44c05b284dbe89c9e
9a7340917db079bde467c1cce3c012077e6dc291
KITCHEN DESIGN - NEED HELP GETTING STARTED?
Check out the Home Depot Kitchen Planning Guide with : Sample kitchen layouts, in-depth questionnaire, kitchen remodel cost estimator, style guide, kitchen cabinet options, and much more!
Read This Before You Remodel A Kitchen – This Old House
The Essential Guide to Your Next Kitchen Reno – Architectural Digest
KITCHEN DESIGN - DRAFT SCOPE OF WORK
Now that all the details, ideas, and brainstorming come together, some basic details of the remodel can now be set in stone.
Size of Kitchen Remodel: Our kitchen remodel will be a complete disassembly, but not a complete gut job.
Everything will be replaced except for original floors, trim, baseboards, and plaster.
Scope of Kitchen Remodel: Items replaced, reused/restored, and discarded
616e64b8cef9f3827725524834e742df02c591a3
New Kitchen Cabinets: New custom cabinets are required, as stock and semi-custom won’t meet “built-in” requirements (full refrigerator depth, vent hood service door, farmhouse sink weight and installation).
New Kitchen Countertops: Custom, wood (wood type to be determined).
New Appliances: Refrigerator, range, vent hood, dish washer.
New Lighting: Cabinet interior, cabinet task lighting, ceiling/overhead.
Finishes/Colors: Draft list of finishes and colors for – floors, walls, countertops, trim, cabinets, cabinet hardware, appliances, tile, light fixtures, plumbing fixtures, etc.
Plumbing, electrical, and HVAC updates.
Repair and restoration of the plaster and original trim.
DRAFT KITCHEN DESIGN WORK (concept drawings)
This is the VISION…visualized! We used the first two options here.
On paper: Draw/sketch up aspects of the kitchen remodel on graphing paper, etc.
Easy-to-use computer design program – Home Designer Suite 2019: See my Resources Page for the review.
Hire out Architect/Builder services: They can/will use the info gathered up to this point – Private, Home Depot, IKEA, etc.
Draft dimensions, working heights, size, and scale – Plan and decide the “rough” sizes of everything. Know your sizes (min and max)!!!
Width / Height / Depth: there are some standards, and some are flexible.
64 Important Numbers Every Homeowner Should Know
Appliances
Kitchen Cabinets
Countertops
Draft Before and After Kitchen Design Layout – We did this to help visualize existing and final kitchen designs.
Here is the rough kitchen design that we have decided on!!!
Before (existing kitchen)
e83e8152cee7ed4bdba8685fb1bb63fb9cb89bdf
After (concept)
b224eb5845887e286014037e91433f2083c50efb
KITCHE DESIGN - INITIAL PLANNING CONSULTATIONS
Initial meet with architects, builders, contractors.
Have kitchen remodel ideas/documentation gathered, to date.
Review scope/work.
Get rough estimates/pricing.
Establish rough work schedules and lead-times.
always get at least 3 quotes to assess fair pricing.
always like to have a list of questions to ask.
SET A DRAFT BUDGET / KITCHEN REMODEL COST
Based on research so far and with help of the Home Depot Planner, you should have a rough estimate on the costs for the following:
Kitchen Cabinets/Lighting/Hardware
Kitchen Countertops
Flooring
Appliances
Electrical/Lighting
Plumbing and Fixtures
Paints and Finishes
Fund with savings, construction loan, etc.
Set a Min / Max budget
Emergency Fund/Contingencies (20-30%) of total cost.
THE LOGISTICS OF A KITCHEN REMODEL
54c225f815ac52894a9094f66ed733f1efceabed
It all comes back to Logistics! Now we are at the end of the Initiating (pre-planning) Phase, it is time to pause for a sanity check to make sure all the stuff that is now on the list will work and integrate together.
Prevent Schedule delays, wasted money, and time making returns.
It’s time to start thinking about this! Know what major items (sinks, cabinets, appliances, etc) will be used ahead of time, to:
Ensure all items will work with your design – interact, physically fit, and function together.
Ensure long-lead time or special-order items will arrive on time for the execution phase.
See Dry Run / Mock-Up – more on this next week!!!
Expectation Management: Kitchen downtime alternate kitchen plan
Kitchen remodels are difficult, but with a little knowledge, know-how, and My Old House”Fix”, there is no project you cannot achieve!
Ok, that’s about it for Part 1: Design and Pre-planning.
Stay tuned as we dive into Vintage Kitchen Remodel: Part 2 – Planning & Product Selection
Best of luck, and keep on Fixing!